Tewksbury - (PW-25-03) ANDOVER ST. / NORTH ST. TRAFFIC SIGNAL IMPROVEMENTS PROJECT
Replacement of the existing malfunction management units (mmu), installation of a controller in the existing controller cabinet, updates to signal timing, installation of new 3-section signal heads and 4-section signal heads on existing mast arms, new pedestrian signal heads and a pushbutton on a new post, installation of new signage on the existing mast arm, a 360 video detection camera mounted with extension bracket, and the installation of ramps at the crosswalk with detectable warning panels that are in accordance with MassDOT construction specifications, and all else necessary for the successful completion of the work
Status
Accepting Bids
Bid Date | 11/20/24 2:00pm |
Company & Contacts
Town of Tewksbury
Alvaro Mendoza
978-640-4440 ext. 233
Location
Andover St. at North St. Tewksbury, MA 01876