Tewksbury - (PW-25-03) ANDOVER ST. / NORTH ST. TRAFFIC SIGNAL IMPROVEMENTS PROJECT

Replacement of the existing malfunction management units (mmu), installation of a controller in the existing controller cabinet, updates to signal timing, installation of new 3-section signal heads and 4-section signal heads on existing mast arms, new pedestrian signal heads and a pushbutton on a new post, installation of new signage on the existing mast arm, a 360 video detection camera mounted with extension bracket, and the installation of ramps at the crosswalk with detectable warning panels that are in accordance with MassDOT construction specifications, and all else necessary for the successful completion of the work

Status

Accepting Bids

Bid Date 11/20/24 2:00pm

Company & Contacts

Town of Tewksbury
Alvaro Mendoza  
978-640-4440 ext. 233

Location

Andover St. at North St. Tewksbury, MA 01876

= BID DATES =

All Bids Due on 11/20/24 at 2:00 PM.


= PURCHASE & SHIPPING INFO =

For Printed Sets, NON-REFUNDABLE checks should be made out to Accent Printing. Complete sets only.

Printed sets can be picked up at Accent Printing, 99 Chelmsford Road, (Rear #13) No. Billerica 01862 after an order is placed.

Shipping via UPS is additional.